Jump to content

Bay Bridge Dismantling, San Francisco


likalar

Recommended Posts

Advertisement (gone after registration)

M9, 50mm Summicron The old 2 mile long eastern span of the Bay Bridge had been proven unsafe in an earthquake. A new, safer bridge was recently completed. A contract stipulation for the dismantling of the old bridge is that no debris be allowed to drop into the bay. Piece by piece, the steel will be removed for recycling. The new bridge construction, at 6.3 billion, was several billion dollars over budget and way behind schedule. The removal of the old bridge will take years, and is already behind schedule, and millions over budget.

 

Thanks for having a look.

 

Larry

Welcome, dear visitor! As registered member you'd see an image here…

Simply register for free here – We are always happy to welcome new members!

Link to post
Share on other sites

Thanks, all. GEORG, thanks for asking. I've been documenting the project from below, for several years. I'll dig thru the files and post some more under another thread hopefully later today.

 

Larry

Link to post
Share on other sites

M9, 50mm Summicron The old 2 mile long eastern span of the Bay Bridge had been proven unsafe in an earthquake. A new, safer bridge was recently completed. A contract stipulation for the dismantling of the old bridge is that no debris be allowed to drop into the bay. Piece by piece, the steel will be removed for recycling. The new bridge construction, at 6.3 billion, was several billion dollars over budget and way behind schedule. The removal of the old bridge will take years, and is already behind schedule, and millions over budget.

 

Thanks for having a look.

 

Larry

 

Music to a construction arbitrator's ears :-)

 

Nice image.

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...