M9, 50mm Summicron The Main cables are now being strung. Soon the vertical cables will be installed and tuned. After the cables are fully supporting the giant white roadway, the rust-colored framework below will be dismantled.

 

The presently-used bridge, to the left, is too rigid to withstand bigger earthquakes. Thanks for taking a look.

 

Larry

Link to post
Share on other sites

M9, 50mm Summicron The Main cables are now being strung. Soon the vertical cables will be installed and tuned. After the cables are fully supporting the giant white roadway, the rust-colored framework below will be dismantled.

 

The presently-used bridge, to the left, is too rigid to withstand bigger earthquakes. Thanks for taking a look.

 

Larry

 

Very good composition. What is going to happen to the old bridge?

 

Bernhard

Link to post
Share on other sites

Very good composition. What is going to happen to the old bridge?

 

Bernhard

 

Paul, Bernhard, Herbert, Turner, thank you! The old bridge will be dismantled with torches, wrenches, cranes, etc. and put on barges. Blasting was not an option due to environmental concerns. I think most of the metal will go overseas for recycling. Future Kia cars and trucks.

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...